VAS “Valsts nekustamie īpašumi” nekustamo īpašumu ēku celtnieciskie remontdarbi Zemgales reģionā
Sole bid landed suspiciously close to the internal estimate
3,312 signals loaded
Automatically generated screening signals across all tenders, filterable by family, severity, and indicator. False positives are possible, so use them as research leads.
These screening signals are generated by automated algorithms from imported procurement data. Data may be incomplete, and false positives are possible. A signal is a lead for further research, not proof of wrongdoing.
Permalink to this view (with active filters)
Data as of 2026-10-31 · coverage and methodology
Sole bid landed suspiciously close to the internal estimate
Specification parameters narrowly match one product
Specification parameters narrowly match one product
Contract modified after award, at an authority with an unusually high modification rate
Physical proximity requirement restricts bidders
Specification parameters narrowly match one product
Contract modified after award, at an authority with an unusually high modification rate
Sole bid landed suspiciously close to the internal estimate
Contract modified after award, at an authority with an unusually high modification rate
Specification parameters narrowly match one product
Contract modified after award, at an authority with an unusually high modification rate
One supplier dominates this authority's spending
Sole bid landed suspiciously close to the internal estimate
Sole bid landed suspiciously close to the internal estimate
Sole bid landed suspiciously close to the internal estimate
Contract modified after award, at an authority with an unusually high modification rate
Specification parameters narrowly match one product
Winner captures an outsized share of this authority's awards
Single supplier won every lot of a multi-lot tender
Sole bid landed suspiciously close to the internal estimate
Sole bid landed suspiciously close to the internal estimate
Specification parameters narrowly match one product
Specification parameters narrowly match one product
Contract modified after award, at an authority with an unusually high modification rate
Sole bid landed suspiciously close to the internal estimate