Krāslavas novada pašvaldības ielu un ceļu ar grants segumu uzturēšanas darbi
Single supplier won every lot of a multi-lot tender
3,312 signals loaded
Automatically generated screening signals across all tenders, filterable by family, severity, and indicator. False positives are possible, so use them as research leads.
These screening signals are generated by automated algorithms from imported procurement data. Data may be incomplete, and false positives are possible. A signal is a lead for further research, not proof of wrongdoing.
Permalink to this view (with active filters)
Data as of 2026-10-31 · coverage and methodology
Single supplier won every lot of a multi-lot tender
One supplier dominates this authority's spending
Sole bid landed suspiciously close to the internal estimate
Sole bid landed suspiciously close to the internal estimate
Specification parameters narrowly match one product
Contract modified after award, at an authority with an unusually high modification rate
Contract modified after award, at an authority with an unusually high modification rate
Single supplier won every lot of a multi-lot tender
Contract modified after award, at an authority with an unusually high modification rate
Contract modified after award, at an authority with an unusually high modification rate
Winner was registered shortly before winning
Required turnover disproportionate to contract value
One supplier dominates this authority's spending
Sole bid landed suspiciously close to the internal estimate
Winner was registered shortly before winning
Specification parameters narrowly match one product
Sole bid landed suspiciously close to the internal estimate
Single supplier won every lot of a multi-lot tender
Specification parameters narrowly match one product
Contract modified after award, at an authority with an unusually high modification rate
Sole bid landed suspiciously close to the internal estimate
Unusually short bidding deadline
Winner was registered shortly before winning
Contract modified after award, at an authority with an unusually high modification rate
Contract modified after award, at an authority with an unusually high modification rate